Your privacy on eXp
We use cookies to run this site and, with your consent, to measure how it is used so we can improve it. Accept, or customize your choice per category. Cookie Policy

When a property owner decides to sell their home, one of the aspects that generates the most doubt is whether the property needs a habitability certificate or second occupancy license.
The regulations are not the same throughout Spain. Each autonomous community has its own requirements and validity periods, which can cause delays in a property transaction if not checked in advance.
For this reason, working with a trusted real estate agent is especially recommended, as they know the legal requirements of each region and can verify before listing the property on the market whether all documentation is in order.
The habitability certificate is the administrative document that certifies that a property meets the minimum conditions to be habitable (surface area, ventilation, lighting, installations, etc.).
Depending on the autonomous community, it may be necessary for:
selling a property
renting it
contracting utilities
completing certain administrative procedures
In Spain there is no single regulation, so each region has developed its own rules.
Canary Islands: Decree 117/2006
Catalonia: Decree 141/2012
Navarre: Foral Decree 142/2004
Extremadura: Decree 10/2109
Balearic Islands: Law 5/2018
La Rioja: Decree 28/2013
Asturias: Decree 73/2018
Murcia: Law 5/1995
In these regions the certificate was eliminated because control is carried out through first occupancy license or municipal planning control.
Madrid: Not required. Decree 111/2018
Andalusia: Eliminated. Decree 283/1987
Aragon: Eliminated. Decree 60/2009:
Castilla-La Mancha: Not required. Decree 122/1988
Castilla y León: Not required. Decree 147/2000
Galicia: Not required by Decree 240/1989 although first occupancy is required, which is requested via prior notification
Basque Country: Not required. Decree 80/2022. ITE certify or not the maintenance of habitability conditions
Cantabria: Not required. Decree 91/2024. The City Council will control when granting the building license and first occupancy license
Valencian Community: This is a special case as only a declaration of responsibility for first occupancy is required, which expires after 10 years but will be renewed only if subsequent transfers occur or a new gas, electricity or water supply contract needs to be formalized
Important: even if not mandatory, some notaries or buyers may request equivalent technical documentation
Another important aspect is the validity period of the document, as many certificates expire after a number of years. Their expiration depends on the regions but can range from 5 to 30 years. For example in La Rioja the first one expires after 30 years and then every 5 years. In Catalonia the first expires after 25 years and then every 15 years......
When the certificate is expired, it may be necessary depending on the region to process a second occupancy certificate or renewal
The procedure is usually similar in all regions:
Property inspection by a technician
An architect or technical architect reviews the property.
Habitability certificate
The technician certifies that the property meets the requirements.
Submission to the regional or municipal authority
Issuance of the new certificate
The cost depends on each region and the technician performing the inspection.
Typical costs:
Technical certificate: €80 – €200
Administrative fees: €10 – €60
In total, the cost usually ranges between €100 and €250.
Many owners discover these requirements when the property transaction is already well advanced, which can delay the operation by several weeks.
A professional real estate agent can:
verify if the property needs a certificate or license
check if it has expired
coordinate with the technician to renew it
avoid delays at the notary
In short, taking care of these procedures in advance facilitates the sale and gives the buyer peace of mind.